RandomHero
Super Freak
If they charged me in March and don’t ship until June you better believe I will be telling them to **** themselves.You wont get it before june I bet
If they charged me in March and don’t ship until June you better believe I will be telling them to **** themselves.You wont get it before june I bet
Good luck with that. They charged me a month ago for Boba Fett/Tusken Boba and haven't shipped yet. They'll gladly offer you a refund but I'm not sure how that helps you get the figure.If they charged me in March and don’t ship until June you better believe I will be telling them to **** themselves.
Yeah isn’t that what “newly developed body” means? If you look at the notes on the figures, most of them say that. Unless that just means “yeah we stuffed some fat padding into this one “.To be fair, I don't think they've ever needed to make a body with seemless shoulders and jointed elbows before. And while HT doesn't always make specific bodies for a character, they do it pretty often, especially for female characters: Wonder Woman, Harley Quinn, TCW Ashoka, WandaVision Scarlet Witch all come to mind pretty quickly.
Are they hurting for money or something? I can understand a like week or two delay but over a month is just unethical for them to do.Good luck with that. They charged me a month ago for Boba Fett/Tusken Boba and haven't shipped yet. They'll gladly offer you a refund but I'm not sure how that helps you get the figure.
Probably. With the supply chain delays, I'm sure they aren't shipping as much product. But the reality is they just haven't adapted their policies. They used to charge based on when they thought they'd have the item in the warehouse, and the were usually right within 24-48 hours. Now their estimates are off wildly, but they're still charging anyway.Are they hurting for money or something? I can understand a like week or two delay but over a month is just unethical for them to do.
Ridiculous. Thankfully, outside of Ahsoka, I only have Bo-Katan, Batman and Yelena on order with them. I guess I'll use the rewards points from those figures on one last order and then I'm done with them. Enough is enough. It's incredible how they get less and less consumer friendly every few months over the last 2-3 years.Probably. With the supply chain delays, I'm sure they aren't shipping as much product. But the reality is they just haven't adapted their policies. They used to charge based on when they thought they'd have the item in the warehouse, and the were usually right within 24-48 hours. Now their estimates are off wildly, but they're still charging anyway.
And based on my conversations with their CS, they have no plans to change.
It's all automated lol. Maybe these conspiracy theories make it more interesting for ya'll but it's just a matter of them processing final charges when they receive their invoices. NOT necessarily when they have the product in-hand.Are they hurting for money or something? I can understand a like week or two delay but over a month is just unethical for them to do.
There is nothing wrong with bending her arms for photos etc. Just don’t leave it like that for long periods of time. I’ve got a ton of figures with seamless bodies and the only one with damage is Sarah Connor and I bought it already with damage because it was cheaper.All the YouTube in reviews on her I’ve seen have her in nice dynamic poses except that nobody seems to want to bend her arms
Of course there is nothing wrong with bending them but everyone is scared to do it on YoutubeThere is nothing wrong with bending her arms for photos etc. Just don’t leave it like that for long periods of time. I’ve got a ton of figures with seamless bodies and the only one with damage is Sarah Connor and I bought it already with damage because it was cheaper.
The lego game comes out on the 5th no?I still have April 5th for the final payment but it could very well change if they're still having transportation issues from the dock.
Are they hurting for money or something? I can understand a like week or two delay but over a month is just unethical for them to do.
It's all automated lol. Maybe these conspiracy theories make it more interesting for ya'll but it's just a matter of them processing final charges when they receive their invoices. NOT necessarily when they have the product in-hand.
That is crazy. Thanks for chiming in on the subject.Saw this 60 minutes segment on why the supply chain is so slow at the ports of Long Beach and LA. Seems pretty legit. Worth the watch.
I work as a longshoreman on the east coast at the Port of Virginia so I can’t speak to the issues they are facing but it seems very similar to what’s happening here but on a smaller scale.
The last reports I saw showed they are backed up with ships waiting to come into port in the high double digits. That’s really bad. In a normal year you might have one or up to 3 waiting to come in but 60, 70, or 80 ships waiting? That’s crazy.
The ports are so overloaded to capacity that nothing is moving. It’s a perfect storm of a traffic jam.
Thanks for sharing. Yeah, I live here in LA and heard on the news there are at least 50 ships waiting at present. The situation is supposedly "improving", but I'm not sure what that means, exactly.Saw this 60 minutes segment on why the supply chain is so slow at the ports of Long Beach and LA. Seems pretty legit. Worth the watch.
I work as a longshoreman on the east coast at the Port of Virginia so I can’t speak to the issues they are facing but it seems very similar to what’s happening here but on a smaller scale.
The last reports I saw showed they are backed up with ships waiting to come into port in the high double digits. That’s really bad. In a normal year you might have one or up to 3 waiting to come in but 60, 70, or 80 ships waiting? That’s crazy.
The ports are so overloaded to capacity that nothing is moving. It’s a perfect storm of a traffic jam.
Enter your email address to join: