Re: ....and really bad eggs drink up me hearties yo ho. Kit 2 Finished detail pics a
Ok guys just to keep all those who have kits on order posted I am still plugging along here...finals start on Sat and are all next week. And once that ends I will ramp up the production to get it done.
TO DO LIST:
7 more bottles (colder weather is slowing this down)
14 hand cuffs
14 bags of gold
14 maps
14 tattoos
8 jars of dirt
7 crates
DONE STUFF
cream puffs
keys
wanted posters
gold
now the maps and tattoos will be a one day thing for both its just printing and sealing and stuff. Lets see probably take a day to sew all the little coin bags. Probably another days worth to make all the cuffs. And I can get the jars and crates done in one day as well. So about 4 days left of working on things. So these will def go out after the holiday rush hopefully before ole Jack arrives
Ok guys just to keep all those who have kits on order posted I am still plugging along here...finals start on Sat and are all next week. And once that ends I will ramp up the production to get it done.
TO DO LIST:
7 more bottles (colder weather is slowing this down)
14 hand cuffs
14 bags of gold
14 maps
14 tattoos
8 jars of dirt
7 crates
DONE STUFF
cream puffs
keys
wanted posters
gold
now the maps and tattoos will be a one day thing for both its just printing and sealing and stuff. Lets see probably take a day to sew all the little coin bags. Probably another days worth to make all the cuffs. And I can get the jars and crates done in one day as well. So about 4 days left of working on things. So these will def go out after the holiday rush hopefully before ole Jack arrives